basic

Concrete Bags Needed Calculator

How many premix bags to fill a slab or footing.

Compute how many bags of pre-mixed concrete are needed to fill a slab, footing, or column of given length, width, and depth, based on the per-bag yield (typically 0.6 ft³ for an 80-lb bag).

Published Last reviewed 1 min read

Inputs

in
in
in

Results

Enter values and click Calculate to see results.
Was this helpful?

How to use this calculator

  1. Fill in the inputs above using the units you already have.
  2. Values update automatically as you type — no submit button needed.
  3. Hover any result row for the underlying formula and intermediate values.

Formula

Volume_ft³ = L · W · D / 1728. Bags = ceil(volume / yield_per_bag).

In depth

Compute how many bags of pre-mixed concrete are needed to fill a slab, footing, or column of given length, width, and depth, based on the per-bag yield (typically 0.6 ft³ for an 80-lb bag).